Main Store (please note new address)
444 W. Mockingbird Ln.,
Dallas, TX 75247-6614
Phone (800) 634-2622
Hours: 8:00a to 5:00p M-F
Northeast Branch
10725 Sandhill Rd., Ste. 101,
Dallas, TX 75238-1227
Phone (214) 340-8868
Hours: 8:00a to 5:00p M-F

PumpTec Pump Priming Procedure

A couple of steps will help the priming process on a dry pump.
  • 1. Attach an open QC to the pump outlet.
  • 2. Fill the machine solution tank to the top.
  • 3. Turn on vacuums and place the vac hose cuff over the open QC.
    Seal it off against the machine face, or with a towel.
  • 4. Turn the pump on & off a few times (for a few seconds).
  • Usually, that will prime the pump.
  • If that doesn't work, you can "force-prime" the pump with a running garden hose, and open QC.

  • This product was added to our catalog on Wednesday 03 November, 2010.

    Your IP Address is: 3.145.78.117
    Copyright © 2024 Cobb Carpet Supply Online. Powered by Zen Cart